Plan the summer temp surge before clients ring in a panic

A retail client wants to double December's order and your pool is July's size. Work backwards from the first peak shift: forecast, size the pool, plan lead times, brief clients and track fill daily.

By FluxHire.AI Team · Published 21 November 2026 · 22 min read

Sources checked 23 November 2026.

Glass cubes flow through a channel that widens, with a reserve group waiting in a side lane.
Abstract editorial illustration.

It's 8:40 on Monday 23 November and a retail client's operations manager is on the line. She wants to double next month's order. Black Friday is four days away, Christmas is a little over a month off, and your temp pool is the same size as it was in July.

You can say yes to part of that order, with a number and a date, if you work backwards from the first peak shift. Size the pool from your own conversion ratios. Treat police checks and paperwork as fixed lead times. Then tell each client how many shifts you can fill and when you need their orders confirmed. Every example number below is hypothetical, and money is in Australian dollars, so swap in your own.

What changes in the Christmas and January ordering peak

Orders climb just as your best temps want the fortnight off. Clients ramp up before Christmas, and the people who fill those shifts are planning their summer.

The Australian Bureau of Statistics sees the same pattern across the whole labour market. In a 2023 analysis of payroll seasonality, it says activity always rises before Christmas, then falls as many people take summer holidays around public and school holidays. Across all Australian jobs, hours actually worked fell about a third, from roughly 468.7 million in December 2022 to 309.8 million in January 2023 (original series). Your desk won't match that exactly, but expect orders to fall away in the first week of January.

Two things follow for a temp desk.

First, your biggest orders land when your people's availability is thinnest. A temp who worked every week in October may now want 24 December to 4 January off, or only a few shifts around it. You can't plan from headcount. You have to plan from who says yes to which dates.

Second, the ramp down is as steep as the ramp up. Clients that doubled their orders for three weeks may cut them in the first week of January. If you've told temps they have three weeks and the client cuts to one, you'll hear about it from the temps before you see it in your margin.

Timing differs by sector. A retailer's run starts with the sales weekend. Finder reports that Black Friday falls on Friday 27 November this year and Cyber Monday on Monday 30 November, with many retailers starting early. A hospitality client may peak on Christmas functions in the second and third weeks of December. A warehouse may peak a week before a retailer does, because stock has to arrive first. Your own order history tells you which pattern each client follows. The next section shows how to read it.

Forecast from last year's orders and client conversations

Start with what clients asked for, not what you filled. Timesheets only record the shifts that were worked. A shift you couldn't fill leaves no trace in payroll, so a forecast built from timesheets understates demand in exactly the weeks you were short.

If you log orders in JobAdder or another system, pull them. If you don't, rebuild last December from emails, texts and your rostering sheet. It's slow and imperfect, but a rough count of unfilled shifts beats none.

  1. List every week from the first week of November last year to the end of January, by client.
  2. For each week, count shifts ordered, shifts filled and shifts the client cancelled.
  3. Mark the dates that moved demand: the sales weekend, the last full week before Christmas, each public holiday and the school holidays.
  4. Ring each client that matters and ask four questions. How many shifts a week do you expect, and from which date? Which days are the heaviest? When will you confirm your numbers? What is the last day you'd want to hear that we can't cover a shift?
  5. Adjust last year's shape by what the client tells you. Add growth they've committed to. Take off anything that has shrunk.

Say your desk's peak week last year was the week before Christmas, and you've now spoken to your top clients. The arithmetic looks like this.

LineShifts a weekWhere it comes from
Last year's peak week, shifts ordered205Your order log
Of those, shifts you filled170Your timesheets (35 went unfilled)
Retail client says its order doublesAdd 40The client, 40 a week now, 80 from 14 December
Warehouse client closes a week earlierLess 15The client's own shutdown dates
Planning number, week starting 14 December230205 plus 40 less 15

Start from 205, not 170. Starting from filled shifts gives you 195, and you're short before the week begins.

Write down a low, a likely and a high figure for the peak week, for example 190, 230 and 260. Plan the pool for the likely number. Plan your standby list for the high number. Being 30 shifts over is a good problem. Being 30 under can cost you the client.

We found no reliable published benchmark for how much a temp desk's December orders grow, and sectors differ too much for an average to help. Your own order history and your clients' words are the only honest inputs. Where a client won't commit, record it as a range with the date they promised to firm it up. That date goes in your plan.

Size the pool and the standby list from your own ratios

A pool is the group of people who've cleared your checks and could take a shift this month. A standby list is a subset: cleared, inducted people who aren't rostered on a given day but have agreed to take short-notice shifts. You need both, and the second is the one that gets forgotten.

Here's the funnel on a hypothetical desk. In a typical July week it fills 120 shifts with 40 active temps. The planning number for the week of 14 December is 230. Every ratio below is invented, and the working is shown so you can replace each one.

StepRatio or inputResult
Shifts to fill in the peak weekFrom the forecast230
People working, if each takes 3 shifts that week230 divided by 377
Add cover for people who cancel in the week itself, so a late drop-out doesn't leave a holeDivide by 0.85 (15 per cent cover)91 cleared and available
Existing temps who say yes to December dates30 of 40 active30
New people needed, cleared and ready91 less 3061
Share of cleared people who go on to take any shift85 per cent72 cleared
Share of screened people who finish checks and paperwork60 per cent120 screened
Share of applicants you screen40 per cent300 applicants

To add 61 cleared people, this desk needs about 300 applicants and 120 screening conversations. If your ratios are worse, the number climbs fast. A drop from 85 per cent to 70 per cent at the "go on to take any shift" step pushes the cleared figure from 72 to 87 and the applicant figure to about 360.

The two 85s are different drop-outs, not one counted twice. The first 15 per cent covers people who cancel in the week itself. The second covers people who clear checks and then never take a shift, because they got another job, went away or stopped replying.

Hi-vis vests on pegs by a loading dock, a few still hanging ready for a standby shift.
A standby list is the vests still on the pegs: cleared, inducted people who can take a shift at short notice.

Three practical points come out of the table.

Ask your existing temps first, and ask for dates. Send one message that lists the exact days: the week of 14 December, 25 December, 28 December and 1 January. A reply of "I'll be around" is a proposal, not a commitment. Some temps won't answer at all. Text them again on the second day, for example: "Can you do 14 to 24 December? Reply Y or N, plus any dates you can't." For planning, silence is a no. The same distinction is covered in planning contractor availability without assuming an extension, and it holds for casual shifts too. Log the answer against each date, and mark who confirmed and who only hoped.

Last year's good temps are your first call. They're already known to you, and some will have kept their paperwork current. Ring them before you advertise.

Set the cover figure honestly. The 15 per cent in the example is a guess. Use what your own no-show and late cancellation record says about the last two months of the year. If you've never counted, count for a fortnight before the peak starts.

Turn the funnel into a promise

The funnel tells you what you need. The call asks what you can promise, so run it forwards from what the diary allows. Say you can fit only 110 screening conversations by Friday 4 December, ten short of the 120 the plan needs. On the same hypothetical desk:

  1. 110 screened, and 60 per cent finish checks and paperwork: 66 cleared.
  2. 85 per cent of those take a shift: 56 new people.
  3. Add the 30 existing temps who said yes to December dates: 86 cleared and available.
  4. Hold 15 per cent back for cancellations and standby: 73 on the roster, about 13 on the bench.
  5. 73 people at 3 shifts each: about 220 shifts a week.

Against a planning number of 230, you're about ten shifts short. Take them from one client, and make it the one who confirms last. The other clients, 150 shifts a week between them, have given you their dates. The retail client wants 80 but won't confirm its store list until 4 December. So you commit 70 of the 80, and the other ten go on the standby list, filled only if people are left over. That is where "70 of 80" comes from. Decide it now, in a quiet week, rather than on 17 December with a client on the phone.

The 110 is a diary limit, not a target. Whoever makes the screening calls, usually a consultant or a resourcer, is also running the live desk. Count the calls that person can really fit in before 4 December, and use that number.

Onboarding lead times that cannot be compressed

Some steps take as long as they take, and a few of them are not in your hands. Plan from the first shift backwards, and treat each of these as a date, not a hope.

StepWho sets the clockWhat the source saysWhat to plan for
Police checkThe applicant, the check provider and policeAustralian Criminal Intelligence Commission (ACIC): delays of up to 1 month affect a small percentage of checks, and a delay says nothing about criminal historyDecide which roles need a cleared check before the first shift. Tell applicants to apply on day one
Work rightsYou, with the worker's permissionHome Affairs: check visa work conditions on the free VEVO system, with the holder's permissionRun the check before the first shift, not after
Casual paperworkYouCasuals get a Casual Employment Information Statement before or soon after they start, plus the Fair Work Information Statement at the startPut both in your starter pack so nobody forgets on a busy morning
Site induction and licencesThe client and you, togetherAgency and host share safety duties, can't contract out and must work together; workers need licences, training and an inductionBook client inductions now. Ask what tickets each site wants
Super and payroll set-upYour payrollUp to 20 business days for a new employee's first super payment; pay on payday where you canGet fund details at sign-up

The police check is the one that bites this month. Say you open applications on Monday 23 November and want people on shift from Monday 14 December. That's 21 days. The ACIC says only a small percentage of checks are delayed, by up to a month, and you can't tell in advance which applicants those will be. It also encourages employers not to exclude applicants whose checks are delayed.

So ask each client one question this week. Does the role need a cleared check before the first shift, or can the person start while it's pending? That is a decision for the client and your own compliance policy, and you should get it in writing.

If the answer is "before", accept that some people will miss 14 December. The 4 December screening cut-off leaves the last people screened only ten days to clear before then, which is why the late ones go to the second half of the month. If you can't live with that, start checks now on last year's temps whose clearances have lapsed, and tell new applicants to lodge theirs on day one.

Site inductions are a second lead time, and clients control them. Safe Work Australia describes labour hire as workers supplied to a host "to relieve staff shortages, or to supplement the workforce during peak seasonal demand", which is your summer. It also says both businesses must work together, that the agency must make sure the host is providing a safe working environment, and that workers need the relevant licences, training and a safety induction. In practice you need the client's induction slots on the calendar before you can promise start dates.

One more lead time costs nothing but still catches desks out: telling the starter where to go, when, and who to ask for. Say a warehouse opens its 5 am gate to staff only and your new temp is waiting at the visitors' entrance. That costs you a shift. The principles in checking a temporary assignment briefing against confirmed sources apply to every starter, so use one template and have a person confirm each line with the client.

Pay rates, penalty rates and public holidays

The peak runs straight through the most complicated pay calendar of the year. Check five things before you quote.

The rates changed on 1 July. The Fair Work Ombudsman says that from 1 July 2026 minimum award wages rose by 4.75 per cent, and the National Minimum Wage is now $26.44 an hour ($1,004.90 a week). The rise applies from the first full pay period starting on or after 1 July. If a client's charge-out rates were set before then and haven't been revisited, your margin on every peak shift may be thinner than you think.

Public holidays differ by state. The Fair Work Ombudsman publishes the dates. This is the summer list, drawn from its upcoming public holidays page and its 2027 list, both updated in November 2026.

DateHolidayWhere
Thursday 24 DecemberChristmas Eve, part dayFrom 6 pm in Queensland; from 7 pm in the Northern Territory and South Australia
Friday 25 DecemberChristmas DayEvery state and territory
Saturday 26 DecemberBoxing Day (Proclamation Day holiday in South Australia)Every jurisdiction except Tasmania
Monday 28 DecemberAdditional public holiday for Boxing Day (in South Australia, for the Proclamation Day holiday), or Boxing Day itself in TasmaniaEvery state and territory
Thursday 31 DecemberNew Year's Eve, part dayFrom 7 pm in the Northern Territory and South Australia
Friday 1 JanuaryNew Year's DayEvery state and territory
Tuesday 26 January 2027Australia DayEvery state and territory

Check each client site separately. The Fair Work Ombudsman says an employee is entitled to the public holidays where they are based for work, not where they happen to work on the day. A temp based in Melbourne who is sent to a Sydney site doesn't change which holidays apply.

Casuals and public holidays work differently. The National Employment Standards give employees base pay for a public holiday they would normally have worked, except casual employees. So a casual who doesn't work on 25 December has no National Employment Standards entitlement to be paid for it. A casual who does work may be entitled to a penalty rate under their award, and that differs between awards. Look up the multiplier for each award you place under in the Fair Work Ombudsman's pay guide or its Pay and Conditions Tool, and don't carry one figure across clients.

A quick check on your rate card shows why this matters. Say a temp's ordinary pay rate is $30 an hour and, for this example only, the award pays 2.5 times that on a public holiday. That is $75 an hour. If the client's charge rate was built on ordinary hours and stays at $42, you lose $33 an hour on every public holiday hour before on-costs. The client rate card needs a public holiday line.

The right to refuse is real. The Fair Work Ombudsman says an employer can ask an employee to work a public holiday, but the request must be reasonable, and the employee can refuse if they have reasonable grounds or the request is unreasonable. The factors include the person's employment status, whether penalty rates apply and the amount of notice. Notice is the part you control. Ask for 25 December, 28 December and 1 January availability in the same message as the December dates, and roster them early.

It is also the first Christmas under Payday Super. Move your timesheet cut-offs earlier for the pay runs either side of Christmas, so the pay lands before the holidays use up the days you have to get super to the fund. If a run normally closes on Tuesday for a Friday payday, bring it forward, and tell temps the dates when they sign up.

Super now has to move with wages, and the Fair Work Ombudsman notes that from 1 July 2026 employers must pay super at the same time as wages. The Australian Taxation Office (ATO) says a contribution is on time if the fund receives it within 7 business days after you pay the employee, and that a day which is a public holiday for a whole state or territory is not a business day. That takes out 25 December, 28 December, 1 January and 26 January for every pay run around them. The ATO page doesn't say how it treats a part-day holiday such as Christmas Eve in Queensland, so ask your payroll provider before you lock the dates.

Have the capacity conversation before the rush

A client who finds out on 14 December that you can't fill their order has no time to do anything about it. A client who finds out on 25 November does. That is the case for saying no early, and it's the strongest reason to have this talk this week.

Go in with a number, a range and a date. A script you can adapt:

"Based on how many people I can screen and clear by then, I can commit to 70 of the 80 shifts a week you've asked for from 14 December, and I'll put my standby list on the other ten. To hold that, I need your confirmed store list and dates by Friday 4 December. If your numbers go up after that, I'll tell you the same day what I can add and what I can't."

Showing the forecast behind the number helps when they push back.

Agree these points with each major client before the end of the month:

  1. The volume range and the date the client will confirm it. Put the date in writing.
  2. Minimum notice for extra shifts. "Same day" is different from "48 hours", and you should price them differently.
  3. Cancellation terms. If the client cuts a shift on the morning, who pays the temp?
  4. Which shifts are public holidays and which rate applies. Match it to the rate card.
  5. Site induction and ticket requirements. Get slots booked, and find out whether the client needs a police check before the first shift.
  6. Who at the client's end confirms hours and timesheets. This matters when pay runs fall around public holidays.

Some clients won't commit to anything. Write down that the client wouldn't commit, with the date you asked. If a client has a history of last-minute orders, plan their share of your standby list accordingly, and tell them what that costs you. If capacity is short, the client who confirms last takes the cut, as in the example above.

The trade-off is plain. Saying no to ten shifts today may cost you some revenue. Saying yes and missing them on 18 December costs revenue and the client's trust. A client can plan around a stated limit. They can't plan around a broken promise.

A week-by-week plan on one desk

Here is the plan for the hypothetical desk, with real dates. The first column starts on Monday 23 November, the day the call comes in.

A blank wall planner with a few days circled in red and sticky notes along its edge.
Circle the dates you cannot move first, then plan the rest of December around them.
Week startingWhat happensDecision to make
Mon 23 NovemberPull last year's orders and call top clients. Send the availability message with exact dates. Open advertising. Ask clients whether police checks are needed before first shifts. Set the planning number (low, likely, high) by Wednesday 25 NovemberWhich clients get a firm number, and which get a range
Mon 30 NovemberCyber Monday. Chase any client who hasn't confirmed dates ahead of the 4 December cut-off. Screen applicants. Start checks and paperwork for everyone cleared to startWhether to cap applicants at what you can screen
Mon 7 DecemberLast full week for new starters to clear. Run client inductions. Publish the roster for 14 to 24 December. Fix cut-offs for pay runsWho goes on standby, and which shifts you'll hold back
Mon 14 DecemberPeak week one. Track fill daily. Use standby as neededWhether fill is below your trigger for two days running
Mon 21 DecemberChristmas week. Roster 25 December and 28 December. Earlier timesheet cut-offs applyWhat you promise for 1 January
Mon 28 DecemberPublic holiday in every state and territory. Roster 1 January. Warn temps about pay datesWhich temps go to the January list and which are released
Mon 4 JanuaryFirst full working week of the new year. Review the peak and release the poolWhat you learned, and which temps to ring first next year

A few rules of thumb run through that table. Nobody who still needs an induction gets added after 7 December. Your coordinators are rostering and chasing no-shows that week. They can't also induct someone new. The planning number is a live number. If the retail client's orders move from 80 to 100 a week on 3 December, the funnel above gets re-run before you say yes. And someone on your team owns each row, with a name beside it. Put a name next to every row, or on 16 December nobody knows who rings the standby list.

Track fill daily while the peak runs

Fill rate here means the share of shifts a client ordered that were filled, with the person on site at the start. Define it before the peak and write the definition down, for example in the style of a glossary of common recruitment KPI formulas. Three choices matter. Count the quantity the client first asked for as "ordered", not the quantity after you negotiated it down. Count a no-show as unfilled. And count a shift as filled only when the person is on site at the start. A shift that falls over at 6 am is unfilled.

Here's a daily tracker on the hypothetical desk. The planning number of 230 is a week of about 46 shifts a day over five days, and the tracker shows the all-client total. The thresholds are examples only, so set yours from your own last two months.

DayOrderedFilled and on siteFill rateStandby usedAction
Mon 14 December464496%2None
Tue 15 December484185%3First day below the 90% trigger. Note which shifts failed and warm up the standby list for Wednesday
Wed 16 December504896%5Back above trigger, so no stop on same-day orders. Review why Tuesday's shifts failed

The rule in this example works client by client, so in practice you keep one line per client rather than one total. Fill below 90 per cent for two days running from a client means you stop taking new same-day orders from that client and phone them before 10 am.

On the morning of 15 December, the question you'd ask is "ordered and filled shifts by client for the last seven days". If your orders and fills are recorded in your ATS, FluxHire's recruitment analytics can build that seven-day view from one plain-English question. Press Cmd or Ctrl + K on any screen and ask the Global AI Centre. The report is built from your synced records and marked AI-generated, and you choose whether to pin it to a dashboard, which then runs the report again on the latest synced records when someone opens it.

It only shows what your current ATS has synced. You still set the fill rate definition from the paragraph above. Reports never change your records, and FluxHire works alongside your current ATS. If you'd like to try that on one desk before next peak, you can request early access.

Objections and trade-offs

"Won't I be left with about 60 new people and no shifts in January?" It's a fair worry. The ABS shows hours worked falling sharply after Christmas, so demand does fall. Casual shifts are offered, not guaranteed, so be straight with new starters about it. Say in the advert and at sign-up that the work is a peak run, give the likely end date, and tell them you'll offer shifts as they arise. Then, for the sectors that pick up again in February, keep the best of them for that run.

"If temps stay on, do they become permanent?" Not by default. The Fair Work Ombudsman says that under the employee choice pathway a casual can give written notice if they've worked for at least 6 months (12 months for a small business) and believe they no longer meet the casual definition. A few weeks' peak run is well short of that. A temp you've used regularly since the winter might not be. Check the pathway with your adviser, and see the casual conversion rules, updated 26 August 2025.

"Why not just say yes to everything and scramble?" Some desks do, and it works in a mild year. It fails when three clients ring on the same Thursday. The standby list and the cut-off dates are cheap insurance against that Thursday, and they cost you a few conversations in November.

"Isn't this a lot of planning for a few weeks of peak?" A first pass is a long afternoon if your orders are in the ATS, and a few days if they're in inboxes. The second year is far quicker, because the order log, the funnel ratios and the client numbers are already there. The cost of not doing it may be a client who moves some of their volume to another supplier in January.

After the peak: release the pool and review

The peak is over when clients' orders fall, not when the calendar says so. Write the January release date into the starter's confirmation message.

In the first week of January, do four things.

  1. Release people properly. Tell each temp what comes next and when. Thank the ones who took the awkward shifts. Some of them will still be on your books next July.
  2. Count what happened. Compare ordered, filled and worked shifts to the plan, week by week, client by client. Note where the funnel ratios were wrong and by how much.
  3. Sit down with clients. Use the same structure as a client service review: what was agreed, what you delivered, what went wrong and what changes for next year.
  4. Plan the people whose assignments end. The ideas in evaluating contractor redeployment preparation apply to temps as well. Check availability and permission before you ring, and keep the best performers warm.

Then write down the numbers: the planning number you used, the actual peak, the ratios at each step, the dates the checks cleared. Next November, that page is your forecast.

Back to Monday 23 November. You don't answer the operations manager on the spot. You tell her you'll ring back by Wednesday with a number. By then you've pulled last December's orders, run the funnel and checked how many screening conversations the diary allows. On Wednesday 25 November you tell her you can commit to 70 of her 80 shifts a week from 14 December, with the other ten on standby, if she sends her confirmed store list and dates by Friday 4 December. She says she'll check with her regional managers. You send the same words in an email within the hour. The availability message to your temps, with the exact dates, went out on Monday afternoon.

Frequently asked questions

How far ahead should a staffing agency plan for the Christmas and January peak?

Plan backwards from the first peak shift, using your slowest lead time as the limit. This year that includes police checks, which the Australian Criminal Intelligence Commission (ACIC) says are delayed by up to a month for a small percentage of applicants. One Australian on-demand staffing platform advises starting 6 to 8 weeks before a warehouse peak, but treat that as vendor guidance. For this peak, the date that matters is 14 December, 21 days after 23 November, so start with the availability message and client calls this week.

Do casual temps get paid for public holidays they don't work?

Not under the National Employment Standards. They give base pay for a public holiday to employees who would normally have worked that day, but the Fair Work Ombudsman says that rule excludes casual employees. A casual who does work a public holiday may be entitled to a penalty rate under their award, and the multiplier differs by award. Check the pay guide for each award you place under.

Can a temp refuse to work on Christmas Day or New Year's Day?

Yes, if they have reasonable grounds or the request is unreasonable. The Fair Work Ombudsman says an employer may ask, but the request must be reasonable. It lists factors such as employment status, notice and whether penalty rates apply. Ask early, roster early and keep the standby list ready for refusals.

How many temps do I need for a peak week?

Divide the shifts you expect to fill by the shifts each person will take, add standby cover, then take off the existing temps who confirm availability. Work back through your own conversion ratios to find how many applicants that takes. The worked table above shows the steps with hypothetical numbers.

Does Payday Super change temp payroll over Christmas?

It can. From 1 July 2026 employers must pay super with wages, and the ATO treats a contribution as on time if the fund receives it within 7 business days of payday. A public holiday for a whole state or territory isn't a business day, so 25 December, 28 December and 1 January stretch the deadline. Check part-day holidays with your payroll provider.